Budget & finances
Every Victorian council reports the same set of financial measures to the state each year, under the Local Government Performance Reporting Framework (LGPRF). The state doesn't set pass marks for these measures. So we show Stonnington's figure for 2024–25 next to the median of all Victorian councils. The median is the middle value: half of councils are above it and half below. The median is a point of reference, not a target.
New to these terms? Read them in plain English
- Operating result (surplus / deficit)
- Income minus expenses for the year's normal operations.
- Average residential rate
- The typical yearly general-rates bill for a home in the area.
The numbers
- Average rate per property (2024–25)
- $1,647General rates plus any municipal charge, divided by all property assessments (homes and businesses). Stonnington has no municipal charge. The Victorian median is $1,937.
- Borrowings
- 49.6% of rates at 30 June 2025The Victorian median is 13.2%. The 2026–27 budget gives total borrowings of $70.96 million at 30 June 2025 and $69.08 million budgeted at 30 June 2027, with $3.0 million of new borrowing in 2026–27 and loan repayments larger than new borrowing. The council says past borrowing funded facilities such as Prahran Square, Toorak Park and the Stonnington Sports Centre.
- Adjusted underlying result (2024–25)
- 0.03% surplusThe operating result without capital grants and contributions, as a share of that revenue. The Victorian median is 0.56%. The 2026–27 budget forecasts an operating surplus of $11.54 million, and a deficit of $4.44 million once restricted capital and open space contributions are removed.
- Unrestricted cash (2024–25)
- −1.00× current liabilitiesThe Victorian median is 0.26×. Under the LGPRF definition, unrestricted cash is cash and cash equivalents less restricted cash, so the measure is negative when restricted cash is larger.
- 2026–27 budget
- $247.29 million operating program; $49.60 million capital worksAdopted at the council meeting of 15 June 2026. It includes $19.73 million for roads, drainage and footpaths (up from a $14.04 million forecast for 2025–26) and $3.70 million for the council's climate action plans.
| Measure (2024–25) | Stonnington | Victorian median |
|---|---|---|
| 0.03% | 0.56% | |
| Current assets ÷ current liabilities (short-term liquidity) | 1.36× | 2.17× |
| Unrestricted cash ÷ current liabilities (free cash) | −1.00× | 0.26× |
| Loans and borrowings ÷ rates | 49.6% | 13.2% |
| Loan repayments ÷ rates | 4.7% | 1.4% |
| Non-current liabilities ÷ own-source revenue | 33.7% | 16.7% |
| Asset renewal and upgrade ÷ depreciation | 119.8% | 94.9% |
| Rates ÷ adjusted underlying revenue (reliance on rates) | 64.2% | 57.8% |
| Rates ÷ property values | 0.13% | 0.28% |
| Expenses per property assessment | $3,286 | $4,100 |
| Average rate per property assessment | $1,647 | $1,937 |
Stonnington City Council, LGPRF financial measures, 2024–25, next to the median of the 79 Victorian councils reporting each measure. Source: Local Government Victoria, LGPRF 2020–2025 Full Council Data Set (Nov 2025 release), CC BY 4.0. The median is CouncilBeacon's own calculation.
The LGPRF has no official benchmarks, and Local Government Victoria says its data shouldn't be used for simplistic league tables. So we don't mark any figure as a pass or a fail, and we don't rank councils. The Victorian median is CouncilBeacon's own calculation, taken across the Victorian councils that report each measure in the 2024–25 data set. A figure above or below the median isn't good or bad in itself. Councils differ in size, assets and services, and the council's annual report explains its own results. The 2025–26 figures are due in about November 2026.
Sources — check it yourself
- Local Government Victoria — LGPRF 2020–2025 Full Council Data Set (XLSX, Nov 2025 release, CC BY 4.0) · 2024–25
- DataVic — Local Government Performance Reporting (dataset and licence) · 2024–25
- Victorian Government — Know Your Council comparison dashboard · Sep 2026
- City of Stonnington — Final adopted Budget 2026–27 (PDF, via Connect Stonnington; Mayoral and CEO introductions, borrowings) · 2026–27
- Connect Stonnington — Budget 2026–27 (adopted 15 June 2026) · Sep 2026
- City of Stonnington — Annual Report and Budget · Sep 2026
Figures are current as at the dates shown and may change — always confirm with the linked source. See the notice at the bottom of the page for full details and how to report a correction.